精品一区二区在线欧美日韩_人人狠狠综合久久亚洲_色婷婷亚洲一区二区三区_国产精品久久久久精品综合

  • <var id="xyaoh"><tr id="xyaoh"></tr></var>
  • Wuxi Gotele Metal Products Co., Ltd : CN EN
    搪瓷管

    Thickness: 0.5mm - 15mm


    Outside Diameter: 8mm-325mm


    Length: Customized


    Capacity: 1000 Mt/month


    Material: 10#, 20#, 16Mn, A106(B,C), Q235, Q345 etc

    產品詳情技術參數(shù)包裝其他
    Features:
    1. The enamel tube has the characteristics of high temperature resistance, corrosion resistance, smoke resistance, and the service life is 3-5 times that of the ordinary air preheater. 
    2. The enamel steel tube is manufactured with the enamel which is our own developed with scientific formula and is evenly coated on the surface of the steel tube by the auto enamel tube production line.
    3. To use enamel tube as the heat exchanger parts will be anti-abrasion and anti-corrosion, the surface is smooth and low cost of maintenance. 
    4. To adapt the different boiler burning type, different fuel and different fume ingredient, we developed the different enamel tube air preheaters to fit different medium.

    Processing method: 

    Raw Steel Coil - Slitting Into Request Width - High Frequency Straight Seam Welding (Hot Extrusion Process For Seamless) - Clearing burrs -

    Cutting Request Length -Enameled Coating Process - Packing


    Enameled Coating Tubes 
    1. thickness: 0.5mm - 15mm
    2. Outside Diameter: 8mm-325mm
    3. Length: Customized
    4. Capacity: 1000 Mt/month
    5. Material: 10#, 20#, 16Mn, A106(B,C), Q235, Q345 etc

    Packing: 

    Shanghai Metal Products are packed and labeled according to the regulations and customer's requests. Great care is taken to avoid any damage which might be caused during storage or transportation.

    In addition, clear labels are tagged on the outside of the packages for easy identification of the product I. D. and quality information.

    1)Shanghai Metal Standard

    2)Customization

    Applications: 

    Air Pre-Heater, Economizer, Water-Cooled Wall 

    Advantages: 
    1. Because the current boilers use the regenerative cycle, the steam turbine is used to extract the steam to heat the water. At this time, the economizer The function can no longer meet the energy saving requirements of the boiler, so the enamel tube air preheater must be installed.
    2. Improve the fuel's ignition conditions, as well as some changes in the combustion process, to maximize fuel, saving fuel utilization. This is very substantial advantage.
    3. When the air enters the furnace, because of the enamel tube air preheater, the theoretical combustion value is increased, and more importantly, the furnace radiation is enhanced and the heat transfer is enhanced to achieve energy saving of the boiler.
    4. The task of the enamel tube can help air preheater upgrade the hot air, acting as a desiccant and porter of coal powder.

    上一篇:可拆卸接頭
    下一篇:吹氧管
    首頁電話產品導航
    CN EN
    沛县| 贵定县| 武陟县| 和硕县| 五家渠市| 汉寿县| 松桃| 崇信县| 吉木乃县| 山阴县| 乌拉特前旗| 扎囊县| 凤山市| 昌吉市| 宝丰县| 来安县| 贡嘎县| 奇台县| 正蓝旗| 朝阳县| 吴旗县| 娱乐| 浦江县| 文登市| 务川| 萍乡市| 耒阳市| 海淀区| 句容市| 崇阳县| 塔河县| 长垣县| 丰宁| 贵州省| 阿拉善左旗| 商河县| 云龙县| 平谷区| 阳高县| 马鞍山市| 蒙自县|