精品一区二区在线欧美日韩_人人狠狠综合久久亚洲_色婷婷亚洲一区二区三区_国产精品久久久久精品综合

  • <var id="xyaoh"><tr id="xyaoh"></tr></var>
  • Wuxi Gotele Metal Products Co., Ltd : CN EN
    Enamel pipe

    Thickness: 0.5mm - 15mm


    Outside Diameter: 8mm-325mm


    Length: Customized


    Capacity: 1000 Mt/month


    Material: 10#, 20#, 16Mn, A106(B,C), Q235, Q345 etc

    Product DetailTechnical InformationPackagingMore
    Features:
    1. The enamel tube has the characteristics of high temperature resistance, corrosion resistance, smoke resistance, and the service life is 3-5 times that of the ordinary air preheater. 
    2. The enamel steel tube is manufactured with the enamel which is our own developed with scientific formula and is evenly coated on the surface of the steel tube by the auto enamel tube production line.
    3. To use enamel tube as the heat exchanger parts will be anti-abrasion and anti-corrosion, the surface is smooth and low cost of maintenance. 
    4. To adapt the different boiler burning type, different fuel and different fume ingredient, we developed the different enamel tube air preheaters to fit different medium.

    Processing method: 

    Raw Steel Coil - Slitting Into Request Width - High Frequency Straight Seam Welding (Hot Extrusion Process For Seamless) - Clearing burrs -

    Cutting Request Length -Enameled Coating Process - Packing


    Enameled Coating Tubes 
    1. thickness: 0.5mm - 15mm
    2. Outside Diameter: 8mm-325mm
    3. Length: Customized
    4. Capacity: 1000 Mt/month
    5. Material: 10#, 20#, 16Mn, A106(B,C), Q235, Q345 etc

    Packing: 

    Shanghai Metal Products are packed and labeled according to the regulations and customer's requests. Great care is taken to avoid any damage which might be caused during storage or transportation.

    In addition, clear labels are tagged on the outside of the packages for easy identification of the product I. D. and quality information.

    1)Shanghai Metal Standard

    2)Customization

    Applications: 

    Air Pre-Heater, Economizer, Water-Cooled Wall 

    Advantages: 
    1. Because the current boilers use the regenerative cycle, the steam turbine is used to extract the steam to heat the water. At this time, the economizer The function can no longer meet the energy saving requirements of the boiler, so the enamel tube air preheater must be installed.
    2. Improve the fuel's ignition conditions, as well as some changes in the combustion process, to maximize fuel, saving fuel utilization. This is very substantial advantage.
    3. When the air enters the furnace, because of the enamel tube air preheater, the theoretical combustion value is increased, and more importantly, the furnace radiation is enhanced and the heat transfer is enhanced to achieve energy saving of the boiler.
    4. The task of the enamel tube can help air preheater upgrade the hot air, acting as a desiccant and porter of coal powder.

    HomeTelProductsContact
    CN EN
    兴宁市| 南和县| 舟曲县| 黄平县| 吴川市| 辰溪县| 莲花县| 沙坪坝区| 自贡市| 司法| 任丘市| 柳河县| 四子王旗| 柏乡县| 彰化市| 松滋市| 西贡区| 南陵县| 大竹县| 饶阳县| 华池县| 噶尔县| 和平区| 胶州市| 资溪县| 买车| 基隆市| 蒲城县| 湘阴县| 北流市| 揭东县| 沧源| 三河市| 大城县| 大英县| 青浦区| 遵义县| 岫岩| 扬中市| 调兵山市| 庄河市|